Completed Skuratov house, 365 m²
Completed Skuratov house, 365 m²: facade photographs, floor plans, materials and details of the construction work.
- Floor area
- 365 m²
- Storeys
- 2
- Bathrooms
- 3
- Bedrooms
- 4
Floor plans
Project specifications
- 365 m²
- 2
- 4
- 3
- 16.11×24.055
- Reinforced concrete slab
- Aerated concrete
- Cast-in-place reinforced concrete
- Asphalt shingles
- Clinker brick
Construction packages
Standard
Foundation
300 mm cast-in-place concrete slab.
- Compacting the sub-base
Preparing and compacting a sand-and-gravel and crushed-stone sub-base in 100–150 mm layers, with water application.
- Laying non-woven geotextile
Cutting the material to size, laying it on the prepared base and securing sheets where required.
- Timber formwork
Assembling formwork panels from 50 mm boards, installing bracing and checking levels and alignment.
- Installing service sleeves
Setting out service penetrations, positioning pipe sleeves and checking them before concrete placement.
- Foundation waterproofing
Cleaning and preparing the surface, applying bituminous primer and one or two waterproofing layers, and sealing joints and overlaps.
- Installing reinforcement cages
Cutting and bending reinforcement and ties, then assembling three-dimensional reinforcement cages.
- Concrete delivery and placement
Receiving the concrete mixer truck, checking the concrete visually, arranging delivery by chute or pump and compacting with an immersion vibrator.
Walls
(300 mm autoclaved aerated concrete)
- Laying waterproofing
Two layers around the load-bearing walls, with cleaning, preparation and levelling of the foundation where required.
- External wall masonry
300 mm autoclaved aerated concrete blocks laid with adhesive; the first course is laid on cement-and-sand mortar.
- External wall reinforcement
Cutting chases in the blockwork, installing reinforcement or masonry mesh and filling the chases.
- Internal wall masonry
300 mm autoclaved aerated concrete blocks laid with adhesive; the first course is laid on cement-and-sand mortar.
- Internal wall reinforcement
Cutting chases in the blockwork, installing reinforcement or masonry mesh and filling the chases.
- Installing lintels
Equal-leg steel angles or reinforced-concrete lintels over windows and doors, with level setting and adequate bearing.
- Priming steel angles
Applying primer by brush or roller.
- Cutting steel angles
Cutting angles on site with a grinder or other cutting tool.
- External brick columns
380 mm brick columns on cement-and-sand mortar, with pointed joints and checks for plumb and alignment.
- Brick wall-plate course
Bonded brickwork beneath the wall plate, levelled and fitted with projecting anchor studs.
Intermediate floor
Reinforced concrete.
— timber attic floor
- Reinforced-concrete ring beam
A ring beam around the load-bearing walls, with external insulation and cast-in-place reinforced-concrete beams.
- Installing floor slabs
Crane placement of bonded floor slabs on cement-and-sand mortar applied to the bearing surfaces.
Roof
metal roof tiles
- Installing the wall plate
with waterproofing and a timber underlay: laying waterproofing felt, cutting and installing the wall-plate timber.
- Treating timber for fire and biological protection
application of fire-retardant and preservative treatment with a roller or sprayer, moving the materials to the lifting point and lifting them by hand.
- Installing the rafter system
made from 50 mm boards. Installation of the ridge assembly. Forming notches and fixing the rafters to the wall plate.
- Installing spaced roof battens
made from 25 mm boards. Laying boards on the rafters, fixing them with nails or screws and levelling the surface.
- Installing counter-battens
made from 50 × 50 mm battens. Installation of counter-battens along the rafters, fixing the battens to the rafters with nails or screws.
- Installing waterproofing
laying sheets over the floor structure, forming overlaps and sealing joints with specialist tape. Protecting the insulation from indoor moisture.
- Installing metal roof tiles
using roofing screws to fix sheets to the battens, form side and end laps, and trim the sheets.
- Installing ridges and valleys
installation of metal roof tiles with roofing screws: fixing to battens, forming side and end laps, and trimming sheets.
Comfort
Foundation
300 mm cast-in-place concrete slab.
+ foundation insulation
- Compacting the sub-base
Preparing and compacting a sand-and-gravel and crushed-stone sub-base in 100–150 mm layers, with water application.
- Laying non-woven geotextile
Cutting the material to size, laying it on the prepared base and securing sheets where required.
- Timber formwork
Assembling formwork panels from 50 mm boards, installing bracing and checking levels and alignment.
- Installing service sleeves
Setting out service penetrations, positioning pipe sleeves and checking them before concrete placement.
- Foundation waterproofing
Cleaning and preparing the surface, applying bituminous primer and one or two waterproofing layers, and sealing joints and overlaps.
- Installing reinforcement cages
Cutting and bending reinforcement and ties, then assembling three-dimensional reinforcement cages.
- Concrete delivery and placement
Receiving the concrete mixer truck, checking the concrete visually, arranging delivery by chute or pump and compacting with an immersion vibrator.
+ Laying 100 mm insulation boards or mats without gaps, fixing them where required and adding protective layers where specified.
Walls
(autoclaved aerated concrete
400 mm + facade cladding
+ internal partitions)
- Laying waterproofing
Two layers around the load-bearing walls, with cleaning, preparation and levelling of the foundation where required.
- External wall masonry
300 mm autoclaved aerated concrete blocks laid with adhesive; the first course is laid on cement-and-sand mortar.
- External wall reinforcement
Cutting chases in the blockwork, installing reinforcement or masonry mesh and filling the chases.
- Internal wall masonry
300 mm autoclaved aerated concrete blocks laid with adhesive; the first course is laid on cement-and-sand mortar.
- Internal wall reinforcement
Cutting chases in the blockwork, installing reinforcement or masonry mesh and filling the chases.
- Installing lintels
Equal-leg steel angles or reinforced-concrete lintels over windows and doors, with level setting and adequate bearing.
- Priming steel angles
Applying primer by brush or roller.
- Cutting steel angles
Cutting angles on site with a grinder or other cutting tool.
- External brick columns
380 mm brick columns on cement-and-sand mortar, with pointed joints and checks for plumb and alignment.
- Brick wall-plate course
Bonded brickwork beneath the wall plate, levelled and fitted with projecting anchor studs.
+ Plinth masonry
Setting out and laying standard M150 bricks with bonded joints, checking courses against levels and string lines.
+ Internal partition masonry
120 mm brick partitions on cement-and-sand mortar with bonded joints and checks against levels and string lines.
+ Facade cladding
Facing brickwork using one-and-a-half-height bricks, with a ventilated cavity, level checks and pointed joints.
Intermediate floors
Reinforced concrete.
— reinforced concrete attic floor
+ attic insulation
- Reinforced-concrete ring beam
A ring beam around the load-bearing walls, with external insulation and cast-in-place reinforced-concrete beams.
- Installing floor slabs
Crane placement of bonded floor slabs on cement-and-sand mortar applied to the bearing surfaces.
+ Installing a vapour barrier
Laying sheets over the floor structure with overlaps and taped joints to protect insulation from indoor moisture.
+ Laying insulation
200 mm insulation with staggered joints, using mineral wool or extruded polystyrene.
Roof
metal roof tiles
+ eaves lining and soffits
- Installing the wall plate
with waterproofing and a timber underlay: laying waterproofing felt, cutting and installing the wall-plate timber.
- Treating timber for fire and biological protection
application of fire-retardant and preservative treatment with a roller or sprayer, moving the materials to the lifting point and lifting them by hand.
- Installing the rafter system
made from 50 mm boards. Installation of the ridge assembly. Forming notches and fixing the rafters to the wall plate.
- Installing spaced roof battens
made from 25 mm boards. Laying boards on the rafters, fixing them with nails or screws and levelling the surface.
- Installing counter-battens
made from 50 × 50 mm battens. Installation of counter-battens along the rafters, fixing the battens to the rafters with nails or screws.
- Installing waterproofing
laying sheets over the floor structure, forming overlaps and sealing joints with specialist tape. Protecting the insulation from indoor moisture.
- Installing metal roof tiles
using roofing screws to fix sheets to the battens, form side and end laps, and trim the sheets.
- Installing ridges and valleys
installation of metal roof tiles with roofing screws: fixing to battens, forming side and end laps, and trimming sheets.
+ Installing vinyl eaves lining (soffits)
installation of battens, preparation and trimming of soffits, fixing soffit panels and finishing the corners of the roof lining.
Premium
Foundation
300 mm cast-in-place concrete slab.
+ foundation insulation
+ perimeter drainage
- Compacting the sub-base
Preparing and compacting a sand-and-gravel and crushed-stone sub-base in 100–150 mm layers, with water application.
- Laying non-woven geotextile
Cutting the material to size, laying it on the prepared base and securing sheets where required.
- Timber formwork
Assembling formwork panels from 50 mm boards, installing bracing and checking levels and alignment.
- Installing service sleeves
Setting out service penetrations, positioning pipe sleeves and checking them before concrete placement.
- Foundation waterproofing
Cleaning and preparing the surface, applying bituminous primer and one or two waterproofing layers, and sealing joints and overlaps.
- Installing reinforcement cages
Cutting and bending reinforcement and ties, then assembling three-dimensional reinforcement cages.
- Concrete delivery and placement
Receiving the concrete mixer truck, checking the concrete visually, arranging delivery by chute or pump and compacting with an immersion vibrator.
+ Laying 100 mm insulation boards or mats without gaps, fixing them where required and adding protective layers where specified.
+ Foundation perimeter drainage using 110 mm perforated pipe wrapped in geotextile, with inspection chambers.
Walls
(autoclaved aerated concrete
400 mm + facade cladding
+ internal partitions
+ glazing)
- Laying waterproofing
Two layers around the load-bearing walls, with cleaning, preparation and levelling of the foundation where required.
- External wall masonry
300 mm autoclaved aerated concrete blocks laid with adhesive; the first course is laid on cement-and-sand mortar.
- External wall reinforcement
Cutting chases in the blockwork, installing reinforcement or masonry mesh and filling the chases.
- Internal wall masonry
300 mm autoclaved aerated concrete blocks laid with adhesive; the first course is laid on cement-and-sand mortar.
- Internal wall reinforcement
Cutting chases in the blockwork, installing reinforcement or masonry mesh and filling the chases.
- Installing lintels
Equal-leg steel angles or reinforced-concrete lintels over windows and doors, with level setting and adequate bearing.
- Priming steel angles
Applying primer by brush or roller.
- Cutting steel angles
Cutting angles on site with a grinder or other cutting tool.
- External brick columns
380 mm brick columns on cement-and-sand mortar, with pointed joints and checks for plumb and alignment.
- Brick wall-plate course
Bonded brickwork beneath the wall plate, levelled and fitted with projecting anchor studs.
+ Plinth masonry
Setting out and laying standard M150 bricks with bonded joints, checking courses against levels and string lines.
+ Internal partition masonry
120 mm brick partitions on cement-and-sand mortar with bonded joints and checks against levels and string lines.
+ Facade cladding
Facing brickwork using one-and-a-half-height bricks, with a ventilated cavity, level checks and pointed joints.
+ House glazing
Installing PVC window frames, opening sashes, insulated glass units, internal sills and external flashings.
Intermediate floors
Reinforced concrete.
— reinforced concrete attic floor
+ attic insulation
- Reinforced-concrete ring beam
A ring beam around the load-bearing walls, with external insulation and cast-in-place reinforced-concrete beams.
- Installing floor slabs
Crane placement of bonded floor slabs on cement-and-sand mortar applied to the bearing surfaces.
+ Installing a vapour barrier
Laying sheets over the floor structure with overlaps and taped joints to protect insulation from indoor moisture.
+ Laying insulation
200 mm insulation with staggered joints, using mineral wool or extruded polystyrene.
Roof
metal roof tiles
+ eaves lining and soffits
+ rainwater drainage system
+ snow guards
- Installing the wall plate
with waterproofing and a timber underlay: laying waterproofing felt, cutting and installing the wall-plate timber.
- Treating timber for fire and biological protection
application of fire-retardant and preservative treatment with a roller or sprayer, moving the materials to the lifting point and lifting them by hand.
- Installing the rafter system
made from 50 mm boards. Installation of the ridge assembly. Forming notches and fixing the rafters to the wall plate.
- Installing spaced roof battens
made from 25 mm boards. Laying boards on the rafters, fixing them with nails or screws and levelling the surface.
- Installing counter-battens
made from 50 × 50 mm battens. Installation of counter-battens along the rafters, fixing the battens to the rafters with nails or screws.
- Installing waterproofing
laying sheets over the floor structure, forming overlaps and sealing joints with specialist tape. Protecting the insulation from indoor moisture.
- Installing metal roof tiles
using roofing screws to fix sheets to the battens, form side and end laps, and trim the sheets.
- Installing ridges and valleys
installation of metal roof tiles with roofing screws: fixing to battens, forming side and end laps, and trimming sheets.
+ Installing vinyl eaves lining (soffits)
installation of battens, preparation and trimming of soffits, fixing soffit panels and finishing the corners of the roof lining.
+ Installing the rainwater drainage system
(gutter, gutter connector, outlet, end cap, downpipes and brackets). Installation of eaves, verge and ridge flashings.
+ Installing tubular snow guards
(drilling fixing holes, securing brackets with roofing screws and fitting pipes into the brackets).
Project description
Skuratov is a 365 m² house with a dark clinker brick facade and a distinctive hipped roof. Tall windows and elongated glazed openings stand out against the restrained masonry. The lower canopy echoes the main roof form, giving even this large building a cohesive, unified appearance.
The walls are built with aerated concrete. This material combines masonry construction with the low thermal conductivity of the wall block, while clinker brick facing provides the exterior texture. The dark brick tone connects the facade with the roof and window frames; glass and its bright reflections provide the main contrast.
Asphalt roofing is used for the roof. Asphalt shingles suit roofs with multiple slopes and junctions, and their fine pattern complements the brickwork. The house foundation is a reinforced concrete slab, and the floors are cast-in-place reinforced concrete. These materials form the structure concealed behind the restrained exterior.
The two storeys accommodate four bedrooms and three bathrooms. The study provides a separate place to work, the sauna adds to relaxation at home, and the double-height space gives the shared area greater volume. The terrace, garage and canopy extend the home's functions beyond its living rooms, separating relaxation, parking and everyday household tasks.
View the design


Would you like to build a similar home?
We will prepare a preliminary construction estimate for your plot, budget and preferences.